Connecting Two Large Power Utilities

Power Plant Project

Power Plant and Transmission Line

80 MW Windfarm

200 MW Windfarm

Switchyard

Rural Distribution Substation

200 MW Windfarm

345 kV - 34.5 kV Substation

Project Description:

  • Radial 345 kV - 34.5 kV windfarm substation
  • 2000 amp split bus 34.5 kV configuration

Peak Power Scope:

Complete substation engineering including

  • equipment layout
  • bus system design
  • structural steel design
  • foundation design
  • raceway system design
  • grounding system design
  • metalclad switchgear specification
  • structural and electrical design
  • capacitor bank design
  • relaying
  • SCADA design
  • wiring design