Project Description:

Radial 138 - 34.5 kV windfarm substation with metalclad switchgear secondary configuration.

Peak Power Scope:

Complete substation engineering including

  • equipment layout
  • bus system design
  • structural steel design
  • foundation design
  • raceway system design
  • grounding system design
  • metalclad switchgear specification
  • structural and electrical design
  • capacitor bank design
  • 138 kV transmission line design
  • relaying
  • SCADA design
  • wiring design