Connecting Two Large Power Utilities

Power Plant Project

Power Plant and Transmission Line

80 MW Windfarm

200 MW Windfarm

Switchyard

Rural Distribution Substation

Switchyard

115 kV Switchyard

Project Description:

  • Four 115 kV circuit breaker ring bus
  • Configured for future breaker and a half
  • Four transmission line terminals

Peak Power Scope:

Complete substation engineering including

  • equipment layout
  • bus system design
  • structural steel design
  • foundation design
  • cable trench and conduit
  • grounding system design
  • control building structural design
  • control building electrical design
  • relaying
  • SCADA design
  • wiring design