Project Description:

Four 230 kV circuit breaker ring bus configuration for 684 MW Power Plant. Three transformer and one transmission line terminals. One mile bundled conductor 230 kV transmission line. Existing substation modifications for interconnection of transmission line.

Peak Power Scope:

Complete switchyard engineering including

  • equipment layout
  • bus system design
  • structural steel design
  • foundation design
  • cable trench and conduit system
  • grounding system design
  • control building structural design
  • control building electrical design
  • relaying
  • SCADA design
  • wiring design