Connecting Two Large Power Utilities
230 kV-115 kV, 100 MVA Transmission Substation
Project Description:
- 230 kV-115 kV
- 100 MVA Autotransformer
- 230 kV folded ring bus
- 115 kV breaker and a half configuration
|
|
Peak Power Scope:
230 kV station mechanical design , 115 kV complete design. Engineering including layout, grading and drainage design, bus system design, structural steel design, foundation design, raceway systems design, grounding design, transmission line modifications design, control building design, relaying and control systems design.
|
|
|
|