Connecting Two Large Power Utilities
Power Plant Project
Power Plant and Transmission Line
80 MW Windfarm
200 MW Windfarm
Switchyard
Rural Distribution Substation
|
Power Plant Project
230 kV Substation
Project Description:
- 230 kV-13.8 kV
- Three GSU Transformers
- 318 MVA Power Plant
|
|
|
Peak Power Scope:
Substation engineering including
- equipment layout
- bus system design
- structural steel design, foundation design
- conduit system design
- grounding system design
- control building structural design
- control building electrical design
- relaying
- SCADA design
- wiring design
|
|