Connecting Two Large Power Utilities

Power Plant Project

Power Plant and Transmission Line

80 MW Windfarm

200 MW Windfarm

Switchyard

Rural Distribution Substation

Rural Distribution Substation

115 kV - 13.2 kV Substation

Project Description:

  • 115 kV-13.2 kV Distribution Substation
  • 15/20/25 MVA Transformer
  • Overhead distribution feeders
  • Dedicated feeder for water treatment plant

Peak Power Scope:

Complete substation engineering including

  • layout
  • grading and drainage design
  • bus system design
  • structural steel design
  • foundation design
  • raceway systems design
  • grounding design
  • transmission line modification design
  • control building design
  • relaying and control systems design